Electricity
& Energy Reform Tracker[1]
Reform
Area: Electricity & Energy – Infrastructure, Service Delivery,
Sector Governance
Last Updated: November 2025
Reform
Area: Electricity & Energy – Infrastructure, Service Delivery,
Sector Governance
Last Updated: November 2025
Citizen Impact Summary
Dimension
Snapshot
Source
Who
Is Affected?
83% of households rely on neighborhood diesel generators;
~19% have members needing electricity for medical equipment; poorest
households face ~11 hrs/day blackout.
Financial
Burden?
Private generator sector worth ~$3 billion; medium-sized
generators generate $17,000–22,000/month; large mega-generators generate
$160,000–211,000/month.
Public
Services?
~85% of households report water access disruptions due to
electric pump failures; over 33% report daily cooking/heating disruption;
80%+ report multiple daily activity impacts.
MentalHealth
Toll?
Residents describe blackouts as worsening anxiety, family
tension, emotional exhaustion; mothers report children crying, rising family
stress.
|
Dimension |
Snapshot |
Source |
|
Who
Is Affected? |
83% of households rely on neighborhood diesel generators;
~19% have members needing electricity for medical equipment; poorest
households face ~11 hrs/day blackout. |
|
|
Financial
Burden? |
Private generator sector worth ~$3 billion; medium-sized
generators generate $17,000–22,000/month; large mega-generators generate
$160,000–211,000/month. |
|
|
Public
Services? |
~85% of households report water access disruptions due to
electric pump failures; over 33% report daily cooking/heating disruption;
80%+ report multiple daily activity impacts. |
|
|
MentalHealth
Toll? |
Residents describe blackouts as worsening anxiety, family
tension, emotional exhaustion; mothers report children crying, rising family
stress. |
Overview
& Objectives
Goal
Secure 24 h · day
affordable, reliable, cleaner electricity by 2026 while
eliminating the fiscal deficit of the power sector by 2027.
Strategic
Importance
Cornerstone of IMF & donor packages (IMF SBA,
World Bank Power Sector Policy Loan 2025). Enables industrial revival,
job creation, and reduces US$ outflow for diesel.
Key
Reform Priorities
1. Increase & diversify supply (gas imports,
3 × 825 MW CCGT, 2.1 GW solar/wind).
2. Restore financial sustainability (tariff
indexation 2022, Cost Recovery Plan).
3. Slash non‑technical losses from 30 % (2023) to
≤ 20 % (2026) via anti‑theft + smart‑meters
4. Stand‑up independent ERA & unbundle EDL into
G/T/D with PPPs for Distribution.
5. Modernise transmission (NCC rebuild, 220 kV
loops) to integrate new capacity.
6. Roll‑out Cash Waterfall for transparent cash‑flow.
|
Goal |
Secure 24 h · day
affordable, reliable, cleaner electricity by 2026 while
eliminating the fiscal deficit of the power sector by 2027. |
|
Strategic
Importance |
Cornerstone of IMF & donor packages (IMF SBA,
World Bank Power Sector Policy Loan 2025). Enables industrial revival,
job creation, and reduces US$ outflow for diesel. |
|
Key
Reform Priorities |
1. Increase & diversify supply (gas imports,
3 × 825 MW CCGT, 2.1 GW solar/wind). 2. Restore financial sustainability (tariff
indexation 2022, Cost Recovery Plan). 3. Slash non‑technical losses from 30 % (2023) to
≤ 20 % (2026) via anti‑theft + smart‑meters 4. Stand‑up independent ERA & unbundle EDL into
G/T/D with PPPs for Distribution. 5. Modernise transmission (NCC rebuild, 220 kV
loops) to integrate new capacity. 6. Roll‑out Cash Waterfall for transparent cash‑flow. |
Reform
Actions & Status
Specific
Reform Actions & Accountability
Reform Action Required
Current Status
Lead Authority
Implementing Body
Oversight / Supporting Actors
Primary Source
Anti-theft
enforcement campaign scaled nationwide
EDL announced and began a widespread campaign to remove
illegal connections, with support from security forces and legal action for
non-compliance, October 2025.
EDL
EDL - ISF
MoI - Judiciary
NREAP
2025–2030 launched, 30% RE target by 2030
LCEC and MoEW released the National Renewable Energy
Action Plan 2025–2030 in late September, published October, setting a pathway
toward 30% of electricity consumption from RE by 2030.
MoEW
LCEC
UK Embassy, partners from LGEE 2025
Decrees
signed to implement World Bank RESRP components
Decrees issued Oct 7 to implement two WB-funded
electricity projects under the $250m IBRD loan, enabling AMI systems, NCC
works, hydropower rehab and solar integration to proceed.
CoM - MoF
MoEW - EDL - Litani River Authority
World Bank
ERA
institutional onboarding supported by MEDREG
Following the Sept 11 appointments, MEDREG met the ERA
president in Beirut and confirmed technical support for the authority’s
initial phase, October 2025.
ERA
ERA Secretariat
MEDREG
EDL
HQ & NCC Reconstruction Tender Suspended for Investigation
Tender suspended Aug 2025 after objections; PPA &
Court of Audit investigating for transparency; re-tender expected Q4 2025.
EDL
CDR
PPA · Court of Audit · MoEW
Review
of Service Provider (DSP) Contracts
Highlighted by WB and media as corruption-prone;
recommended termination or redesign for efficiency.
MoEW
EDL
WB · IOB (3RF)
National
Emergency Plan (Oct 2022)
Approved; formed the basis for CRP design.
CoM
MoEW · EDL
MoF · Parliament Budget Committee
Cost
Recovery Plan (CRP 20242028) execution
Approved by EDL Board (4 July 2024), MoEW (21 July 2024),
and submitted to World Bank (19 Aug 2024); tariff adjusted Feb 2023.
CoM
MoEW · EDL
MoF · Parliament Budget Committee
Cash Waterfall
Mechanism (CWM)
Concept designed by EDL & MoEW; endorsed by BDL on 18
Aug 2024; operational manual under development.
BdL
EDL Treasury
MoEW · MoF
Audited
Financial Statements (AFS)
2020 AFS disclosed (8 Aug 2024); auditor recruited to
complete 2020–2022 statements and establish opening balances.
EDL
EDL Finance
MoEW · MoF
Electricity
Regulatory Authority (ERA) establishment
International partners initiated onboarding support in
October, yet external observers note that delayed activation and missing
secondary rules still constrain DRE law implementation.
CoM
ERA
MoEW, MoF
New
EDL Board of Directors
Work on forming a new EDL Board of Directors publicly
announced by MoEW on 26 March 2025, with implementation to follow
the mechanism approved by the Council of Ministers; no formal public date
provided for nomination file submission or shortlist milestones.
CoM
MoEW
Presidency of CoM
Antitheft
/ loss reduction incentive campaign
Policy to combat illegal grid connections (“non-technical
losses”) announced by MoEW on 26 March 2025; measures include
launching enforcement campaigns, applying incentive schemes for compliant
areas, and coordinating with Internal Security Forces; pilot implementation
planned for the coming period, but no formal public dates provided for
Q2 2025 mapping.
MoEW
EDL · ISF
MoI · MoD
Settlement
of state entity arrears
(≈ US$ 200 m)
MoEW announced on 26 March 2025 its intent to
recover approximately US$ 200 million in overdue payments from
state entities; ministry committed to following up with the Ministry of
Finance for inclusion in the Draft Budget 2025; no formal public confirmation
found for a dated MoEW letter or MoF review status.
MoF
Line ministries
CoM
World Bank IBRD Power Sector Loan
(US$ 250 m)
Media reported cabinet approval expected in early
September for the WB loan decree to advance metering, NCC, hydro rehab, and
grid-connected solar.
MoF
MoEW · EDL
World Bank
World
Bank, Project Appraisal Document, September 2024;
Voice
of Lebanon, 4 Sep 2025
EDL
headquarters & National Control Centre reconstruction
Tender suspended Aug 2025 after objections; PPA &
Court of Audit investigating for transparency; re-tender expected Q4 2025.
EDL
CDR
PPA · Court of Audit · MoEW
Distributed
Renewable Energy (DRE) Law (Dec 2023) – secondary regulations
Ratified by Parliament; secondary regulations to be
developed by ERA after its constitution, including net metering and
peer-to-peer sale rules.
ERA (once seated)
EDL RenewableEnergy Dept.
MoEW
Smart meter / AMI pilot (loss reduction)
World Bank loan funds the establishment of EDL’s AMI
center, including Meter Data Management (MDM), Customer Information System
(CIS), billing systems, and consumer portals; the procurement and
installation of smart meters themselves are handled under separate DSP
contracts; no formal public timeline is explicitly stated for detailed
rollout completion or the initial 50,000-unit deployment.
EDL
DSP contractors
WB · MoEW
Activate
gas-based PPP power plants
Minister Sadde confirmed gas plants as key energy
transition target; feasibility studies to be launched with private sector by
end of 2025
MoEW
PPP Council
IFC · MoF
Sadde Interview, 20 Jun 2025
Fuel
procurement integrity and Iraqi swap audit
MoEW referred alleged mis-pricing in Iraqi swap chain to
judiciary and customs; one vessel detained then intercepted by the army when
attempting to depart. Ministry says state’s rights secured via performance
guarantees. Shift reiterated to paying for fuel from collections rather than
Treasury borrowing.
MoEW
EDL
Customs, Judiciary, LAF, Public Procurement Authority
Regularize
private generators as licensed distributors
Policy analyses highlight converting neighborhood
generators into licensed distribution companies that buy power in bulk from
EDL and handle retail billing/collections to cut ATC&C losses (~40%).
ERA
EDL / licensed distributors
MoEW, PPA, municipalities
|
Reform Action Required |
Current Status |
Lead Authority |
Implementing Body |
Oversight / Supporting Actors |
Primary Source |
|
Anti-theft
enforcement campaign scaled nationwide |
EDL announced and began a widespread campaign to remove
illegal connections, with support from security forces and legal action for
non-compliance, October 2025. |
EDL |
EDL - ISF |
MoI - Judiciary |
|
|
NREAP
2025–2030 launched, 30% RE target by 2030 |
LCEC and MoEW released the National Renewable Energy
Action Plan 2025–2030 in late September, published October, setting a pathway
toward 30% of electricity consumption from RE by 2030. |
MoEW |
LCEC |
UK Embassy, partners from LGEE 2025 |
|
|
Decrees
signed to implement World Bank RESRP components |
Decrees issued Oct 7 to implement two WB-funded
electricity projects under the $250m IBRD loan, enabling AMI systems, NCC
works, hydropower rehab and solar integration to proceed. |
CoM - MoF |
MoEW - EDL - Litani River Authority |
World Bank |
|
|
ERA
institutional onboarding supported by MEDREG |
Following the Sept 11 appointments, MEDREG met the ERA
president in Beirut and confirmed technical support for the authority’s
initial phase, October 2025. |
ERA |
ERA Secretariat |
MEDREG |
|
|
EDL
HQ & NCC Reconstruction Tender Suspended for Investigation |
Tender suspended Aug 2025 after objections; PPA &
Court of Audit investigating for transparency; re-tender expected Q4 2025. |
EDL |
CDR |
PPA · Court of Audit · MoEW |
|
|
Review
of Service Provider (DSP) Contracts |
Highlighted by WB and media as corruption-prone;
recommended termination or redesign for efficiency. |
MoEW |
EDL |
WB · IOB (3RF) |
|
|
National
Emergency Plan (Oct 2022) |
Approved; formed the basis for CRP design. |
CoM |
MoEW · EDL |
MoF · Parliament Budget Committee |
|
|
Cost
Recovery Plan (CRP 20242028) execution |
Approved by EDL Board (4 July 2024), MoEW (21 July 2024),
and submitted to World Bank (19 Aug 2024); tariff adjusted Feb 2023. |
CoM |
MoEW · EDL |
MoF · Parliament Budget Committee |
|
|
Cash Waterfall
Mechanism (CWM) |
Concept designed by EDL & MoEW; endorsed by BDL on 18
Aug 2024; operational manual under development. |
BdL |
EDL Treasury |
MoEW · MoF |
|
|
Audited
Financial Statements (AFS) |
2020 AFS disclosed (8 Aug 2024); auditor recruited to
complete 2020–2022 statements and establish opening balances. |
EDL |
EDL Finance |
MoEW · MoF |
|
|
Electricity
Regulatory Authority (ERA) establishment |
International partners initiated onboarding support in
October, yet external observers note that delayed activation and missing
secondary rules still constrain DRE law implementation. |
CoM |
ERA |
MoEW, MoF |
|
|
New
EDL Board of Directors |
Work on forming a new EDL Board of Directors publicly
announced by MoEW on 26 March 2025, with implementation to follow
the mechanism approved by the Council of Ministers; no formal public date
provided for nomination file submission or shortlist milestones. |
CoM |
MoEW |
Presidency of CoM |
|
|
Antitheft
/ loss reduction incentive campaign |
Policy to combat illegal grid connections (“non-technical
losses”) announced by MoEW on 26 March 2025; measures include
launching enforcement campaigns, applying incentive schemes for compliant
areas, and coordinating with Internal Security Forces; pilot implementation
planned for the coming period, but no formal public dates provided for
Q2 2025 mapping. |
MoEW |
EDL · ISF |
MoI · MoD |
|
|
Settlement
of state entity arrears
(≈ US$ 200 m) |
MoEW announced on 26 March 2025 its intent to
recover approximately US$ 200 million in overdue payments from
state entities; ministry committed to following up with the Ministry of
Finance for inclusion in the Draft Budget 2025; no formal public confirmation
found for a dated MoEW letter or MoF review status. |
MoF |
Line ministries |
CoM |
|
|
World Bank IBRD Power Sector Loan
(US$ 250 m) |
Media reported cabinet approval expected in early
September for the WB loan decree to advance metering, NCC, hydro rehab, and
grid-connected solar. |
MoF |
MoEW · EDL |
World Bank |
World
Bank, Project Appraisal Document, September 2024;
Voice
of Lebanon, 4 Sep 2025 |
|
EDL
headquarters & National Control Centre reconstruction |
Tender suspended Aug 2025 after objections; PPA &
Court of Audit investigating for transparency; re-tender expected Q4 2025. |
EDL |
CDR |
PPA · Court of Audit · MoEW |
|
|
Distributed
Renewable Energy (DRE) Law (Dec 2023) – secondary regulations |
Ratified by Parliament; secondary regulations to be
developed by ERA after its constitution, including net metering and
peer-to-peer sale rules. |
ERA (once seated) |
EDL RenewableEnergy Dept. |
MoEW |
|
|
Smart meter / AMI pilot (loss reduction) |
World Bank loan funds the establishment of EDL’s AMI
center, including Meter Data Management (MDM), Customer Information System
(CIS), billing systems, and consumer portals; the procurement and
installation of smart meters themselves are handled under separate DSP
contracts; no formal public timeline is explicitly stated for detailed
rollout completion or the initial 50,000-unit deployment. |
EDL |
DSP contractors |
WB · MoEW |
|
|
Activate
gas-based PPP power plants |
Minister Sadde confirmed gas plants as key energy
transition target; feasibility studies to be launched with private sector by
end of 2025 |
MoEW |
PPP Council |
IFC · MoF |
Sadde Interview, 20 Jun 2025 |
|
Fuel
procurement integrity and Iraqi swap audit |
MoEW referred alleged mis-pricing in Iraqi swap chain to
judiciary and customs; one vessel detained then intercepted by the army when
attempting to depart. Ministry says state’s rights secured via performance
guarantees. Shift reiterated to paying for fuel from collections rather than
Treasury borrowing. |
MoEW |
EDL |
Customs, Judiciary, LAF, Public Procurement Authority |
|
|
Regularize
private generators as licensed distributors |
Policy analyses highlight converting neighborhood
generators into licensed distribution companies that buy power in bulk from
EDL and handle retail billing/collections to cut ATC&C losses (~40%). |
ERA |
EDL / licensed distributors |
MoEW, PPA, municipalities |
Reform
Roadmap Timeline & Critical Path
Recent Milestone
Date
Description
Critical Path Status
Source
Oct 7,
2025
Cabinet signed decrees implementing two WB-funded power
projects (AMI, NCC, hydro rehab, grid-solar), enabling project execution
steps.
Completed
Oct
2025
National Renewable Energy Action Plan 2025–2030 launched
at LGEE, document published in October.
Completed
Oct
2025
EDL anti-theft campaign scaled nationwide with ISF
support.
In Progress
March
2022
MoEW 5-Year Policy Statement & Least-Cost Generation
Plan endorsed
Completed
November
2022
First tariff indexation since 1994 introduced
Completed
July
2024
Government approves Cost-Recovery Plan (CRP 2024–2027)
Completed
August
2024
Cash Waterfall Mechanism (CWM) concept endorsed by MoEW,
EDL, BdL
Completed
26
March 2025
Minister launches ERA recruitment, EDL board renewal, and
anti-theft plan
Completed
23
April 2025
ERA call for applications opened
Completed
Aug
2025
EDL HQ & NCC tender suspended for anti-corruption
review
In Progress (Critical)
11
September 2025
Council of Ministers appoints ERA (Law 462/2002)
Completed
Asharq
Al-Awsat, 11–12 Sep 2025; An-Nahar op-ed, 13 Sep 2025
|
Date |
Description |
Critical Path Status |
Source |
|
Oct 7,
2025 |
Cabinet signed decrees implementing two WB-funded power
projects (AMI, NCC, hydro rehab, grid-solar), enabling project execution
steps. |
Completed |
|
|
Oct
2025 |
National Renewable Energy Action Plan 2025–2030 launched
at LGEE, document published in October. |
Completed |
|
|
Oct
2025 |
EDL anti-theft campaign scaled nationwide with ISF
support. |
In Progress |
|
|
March
2022 |
MoEW 5-Year Policy Statement & Least-Cost Generation
Plan endorsed |
Completed |
|
|
November
2022 |
First tariff indexation since 1994 introduced |
Completed |
|
|
July
2024 |
Government approves Cost-Recovery Plan (CRP 2024–2027) |
Completed |
|
|
August
2024 |
Cash Waterfall Mechanism (CWM) concept endorsed by MoEW,
EDL, BdL |
Completed |
|
|
26
March 2025 |
Minister launches ERA recruitment, EDL board renewal, and
anti-theft plan |
Completed |
|
|
23
April 2025 |
ERA call for applications opened |
Completed |
|
|
Aug
2025 |
EDL HQ & NCC tender suspended for anti-corruption
review |
In Progress (Critical) |
|
|
11
September 2025 |
Council of Ministers appoints ERA (Law 462/2002) |
Completed |
Asharq
Al-Awsat, 11–12 Sep 2025; An-Nahar op-ed, 13 Sep 2025 |
Next Steps – Transparency and
Accountability Calendar
Action
Responsible Entity
Target Date
Source
Publish
ERA bylaws, internal regulations, and budget execution details.
ERA / MoF / CoM
Q4 2025
MEDREG
note on early-phase support; WEC
note on delayed activation impact.
Disclose
implementation plan and procurement timetable for AMI/MDM, NCC, hydropower
rehab under WB loan.
MoEW / EDL / LRA / PPA
Q4 2025–Q1 2026
Publish
NREAP 2025-2030 implementation dashboard and annual progress KPIs.
MoEW / LCEC
Q1 2026
Re-issue
EDL HQ & NCC tender post-investigation
CDR / EDL / PPA
Q4 2025
Appoint
5-member ERA board via CoM decree
Council of Ministers
Completed 11 Sep 2025
Asharq
Al-Awsat, 11–12 Sep 2025; An-Nahar op-ed, 13 Sep 2025
Publish
ERA bylaws, organogram, and FY2026 budget line
ERA / MoF / CoM
Q4 2025
An-Nahar op-ed, 13 Sep 2025 (on funding and independence
risk)
Close
ERA application portal & publish long-list
OMSAR
6 May 2025
Issue
licensing and tariff-methodology rulebooks incl. DRE Law 318/2023 codes
ERA
Q1 2026
Run
multi-year competitive fuel tenders via the Public Procurement Authority with
full disclosure of awards and specs
MoEW / EDL / PPA
Q4 2025
Issue
tender for EDL HQ & NCC reconstruction
CDR / EDL
May 2025
Finalise
& approve CWM Operations Manual
BdL / EDL
N/A
Appoint
5-member ERA board via CoM decree
Council of Ministers
N/A
Launch
anti-theft campaign phase-1 (pilot areas)
EDL / ISF
N/A
Commission
CCGT1 (825 MW) and reach 20–24 h/day supply
MoEW / EDL / IPP Partners
2026
Sector
achieves full cost-recovery; eliminate subsidies
MoEW / MoF / ERA
2027
|
Action |
Responsible Entity |
Target Date |
Source |
|
Publish
ERA bylaws, internal regulations, and budget execution details. |
ERA / MoF / CoM |
Q4 2025 |
MEDREG
note on early-phase support; WEC
note on delayed activation impact. |
|
Disclose
implementation plan and procurement timetable for AMI/MDM, NCC, hydropower
rehab under WB loan. |
MoEW / EDL / LRA / PPA |
Q4 2025–Q1 2026 |
|
|
Publish
NREAP 2025-2030 implementation dashboard and annual progress KPIs. |
MoEW / LCEC |
Q1 2026 |
|
|
Re-issue
EDL HQ & NCC tender post-investigation |
CDR / EDL / PPA |
Q4 2025 |
|
|
Appoint
5-member ERA board via CoM decree |
Council of Ministers |
Completed 11 Sep 2025 |
Asharq
Al-Awsat, 11–12 Sep 2025; An-Nahar op-ed, 13 Sep 2025 |
|
Publish
ERA bylaws, organogram, and FY2026 budget line |
ERA / MoF / CoM |
Q4 2025 |
An-Nahar op-ed, 13 Sep 2025 (on funding and independence
risk) |
|
Close
ERA application portal & publish long-list |
OMSAR |
6 May 2025 |
|
|
Issue
licensing and tariff-methodology rulebooks incl. DRE Law 318/2023 codes |
ERA |
Q1 2026 |
|
|
Run
multi-year competitive fuel tenders via the Public Procurement Authority with
full disclosure of awards and specs |
MoEW / EDL / PPA |
Q4 2025 |
|
|
Issue
tender for EDL HQ & NCC reconstruction |
CDR / EDL |
May 2025 |
|
|
Finalise
& approve CWM Operations Manual |
BdL / EDL |
N/A |
|
|
Appoint
5-member ERA board via CoM decree |
Council of Ministers |
N/A |
|
|
Launch
anti-theft campaign phase-1 (pilot areas) |
EDL / ISF |
N/A |
|
|
Commission
CCGT1 (825 MW) and reach 20–24 h/day supply |
MoEW / EDL / IPP Partners |
2026 |
|
|
Sector
achieves full cost-recovery; eliminate subsidies |
MoEW / MoF / ERA |
2027 |
Implementation Bottlenecks & Required Actions
Bottleneck
Official Explanation
Required Action
Source
Grid
unprepared for RE scaling
Lack of network reinforcement
Expedite NCC upgrades and ERA guidance for RE integration
Sadde Interview, 20 Jun 2025
85 %
vacancy in MoEW Grade I‑II cadre
Hiring freeze since 2019
Fast‑track DG appointment package announced by minister;
needs CoM approval
Non‑technical
loss ≈ 30 % (US$ 200 m in 2023)
Widespread illegal connections; weak enforcement
Enforce incentive + penalty plan; deploy smart meters (WB
loan)
Publicentity
arrears US$ 200 m
Public bodies not budgeting for bills
MoF to embed arrears line in 2025 budget & CWM
priority
Unfinished
Law 462 revision
Draft never finalised
MoEW legal cell to table draft amendments 2025
Financing
gap for CCGTs
Investors wait for governance signals
Package PPP with WB/IFC guarantee once ERA seated
|
Bottleneck |
Official Explanation |
Required Action |
Source |
|
Grid
unprepared for RE scaling |
Lack of network reinforcement |
Expedite NCC upgrades and ERA guidance for RE integration |
Sadde Interview, 20 Jun 2025 |
|
85 %
vacancy in MoEW Grade I‑II cadre |
Hiring freeze since 2019 |
Fast‑track DG appointment package announced by minister;
needs CoM approval |
|
|
Non‑technical
loss ≈ 30 % (US$ 200 m in 2023) |
Widespread illegal connections; weak enforcement |
Enforce incentive + penalty plan; deploy smart meters (WB
loan) |
|
|
Publicentity
arrears US$ 200 m |
Public bodies not budgeting for bills |
MoF to embed arrears line in 2025 budget & CWM
priority |
|
|
Unfinished
Law 462 revision |
Draft never finalised |
MoEW legal cell to table draft amendments 2025 |
|
|
Financing
gap for CCGTs |
Investors wait for governance signals |
Package PPP with WB/IFC guarantee once ERA seated |
Stakeholders
& Roles
Entity
Core Function
Contact
MoEW
Policy, ERA/EDL nominations
Minister Joe Saddi
CoM
Decrees, budgets
Cabinet Secretariat
OMSAR
ERA recruitment portal
EDL
Grid & singlebuyer
DG K. Hayek
BdL
Cash Waterfall & FX
Treasury Directorate
MoF
Budget, WB loan
Minister Y. Jaber
ISF
Anti‑theft field ops
Ops Command
Economic
Bodies
Privatesector liaison
Chair M. Choucair
World
Bank
US$ 250 m loan, TA
Reg. Dir. J‑C Carré
|
Entity |
Core Function |
Contact |
|
MoEW |
Policy, ERA/EDL nominations |
Minister Joe Saddi |
|
CoM |
Decrees, budgets |
Cabinet Secretariat |
|
OMSAR |
ERA recruitment portal |
|
|
EDL |
Grid & singlebuyer |
DG K. Hayek |
|
BdL |
Cash Waterfall & FX |
Treasury Directorate |
|
MoF |
Budget, WB loan |
Minister Y. Jaber |
|
ISF |
Anti‑theft field ops |
Ops Command |
|
Economic
Bodies |
Privatesector liaison |
Chair M. Choucair |
|
World
Bank |
US$ 250 m loan, TA |
Reg. Dir. J‑C Carré |
Legal
& Policy Framework
Instrument
Status
Key Provisions
Implementation Note
Policy
Statement (March 2022)
In force (2022)
5‑year reform plan 2022–2026
Law
462/2002 (Electricity Law)
In force (since 2002)
Establishes ERA, mandates unbundling, sets tariffs
Cost Recovery Plan 2024–2027
Adopted (July 2024)
10 h supply → sector break-even by 2027
Distributed
Renewable Energy Law (2023)
In force (2023)
Net-metering, peer-to-peer (P2P) energy sales, RE
permitting
World
Bank IBRD Loan (US$ 250 m)
Signed (April 2025)
Rebuild NCC, deploy AMI, 150 MW solar, hydro rehab, grid
upgrades
Ratification
by Parliament & first disbursement pending (Q3 2025)
Cash
Waterfall Concept Note
Endorsed (August 2024)
Revenue escrow, automated FX payments
|
Instrument |
Status |
Key Provisions |
Implementation Note |
|
Policy
Statement (March 2022) |
In force (2022) |
5‑year reform plan 2022–2026 |
|
|
Law
462/2002 (Electricity Law) |
In force (since 2002) |
Establishes ERA, mandates unbundling, sets tariffs |
|
|
Cost Recovery Plan 2024–2027 |
Adopted (July 2024) |
10 h supply → sector break-even by 2027 |
|
|
Distributed
Renewable Energy Law (2023) |
In force (2023) |
Net-metering, peer-to-peer (P2P) energy sales, RE
permitting |
|
|
World
Bank IBRD Loan (US$ 250 m) |
Signed (April 2025) |
Rebuild NCC, deploy AMI, 150 MW solar, hydro rehab, grid
upgrades |
Ratification
by Parliament & first disbursement pending (Q3 2025) |
|
Cash
Waterfall Concept Note |
Endorsed (August 2024) |
Revenue escrow, automated FX payments |
Official
Sources and Reference Materials
Instrument
Source
Policy Statement (March 2022)
Ministry
of Energy and Water, Policy Statement March 2022, official PDF.
Law 462/2002 (Electricity Law)
Law No. 462 of 2002, Republic of Lebanon Official Gazette;
reaffirmed in MoEW statements. (AR
– EN)
CostRecovery Plan 2024–2027
Government
of Lebanon, Council of Ministers Decision July 2024
Distributed Renewable Energy Law (2023)
World Bank IBRD Loan (US$ 250 m)
Cash Waterfall Concept Note
MoEW Press Releases (2024–2025)
|
Instrument |
Source |
||
|
Policy Statement (March 2022) |
Ministry
of Energy and Water, Policy Statement March 2022, official PDF. |
||
|
Law 462/2002 (Electricity Law) |
Law No. 462 of 2002, Republic of Lebanon Official Gazette;
reaffirmed in MoEW statements. (AR
– EN) |
||
|
CostRecovery Plan 2024–2027 |
Government
of Lebanon, Council of Ministers Decision July 2024 |
||
|
Distributed Renewable Energy Law (2023) |
|||
|
World Bank IBRD Loan (US$ 250 m) |
|||
|
Cash Waterfall Concept Note |
|||
|
List
of Acronyms – Electricity & Energy Reform Tracker
Acronym
Full Term
AFS
Audited Financial Statements
AMI
Advanced Metering Infrastructure
BdL
Banque du Liban (Central Bank of Lebanon)
CCGT
Combined Cycle Gas Turbine
CDR
Council for Development and Reconstruction
CIS
Customer Information System
CoM
Council of Ministers
CRP
Cost Recovery Plan
CSB
Civil Service Board
CWM
Cash Waterfall Mechanism
DG
Director General
DRE
Distributed Renewable Energy
DSP
Distribution Service Provider
EDL
Électricité du Liban
ERA
Electricity Regulatory Authority
FX
Foreign Exchange
HRW
Human Rights Watch
IBRD
International Bank for Reconstruction and Development
IFC
International Finance Corporation
IMF
International Monetary Fund
IPP
Independent Power Producer
ISF
Internal Security Forces
MoD
Ministry of Defense
MoEW
Ministry of Energy and Water
MoF
Ministry of Finance
MoI
Ministry of Interior
NCC
National Control Center
OMSAR
Office of the Minister of State for Administrative Reform
PPP
Public-Private Partnership
RE
Renewable Energy
SBA
Staff-Level Agreement (IMF Stand-By Arrangement)
TA
Technical Assistance
WB
World Bank
[1] All reform data presented
here is based on official Lebanese government sources, such as laws, decrees,
strategies, and verified public data. Where possible, each update is linked to
a document, gazette entry, or institutional publication.
|
Acronym |
Full Term |
|
AFS |
Audited Financial Statements |
|
AMI |
Advanced Metering Infrastructure |
|
BdL |
Banque du Liban (Central Bank of Lebanon) |
|
CCGT |
Combined Cycle Gas Turbine |
|
CDR |
Council for Development and Reconstruction |
|
CIS |
Customer Information System |
|
CoM |
Council of Ministers |
|
CRP |
Cost Recovery Plan |
|
CSB |
Civil Service Board |
|
CWM |
Cash Waterfall Mechanism |
|
DG |
Director General |
|
DRE |
Distributed Renewable Energy |
|
DSP |
Distribution Service Provider |
|
EDL |
Électricité du Liban |
|
ERA |
Electricity Regulatory Authority |
|
FX |
Foreign Exchange |
|
HRW |
Human Rights Watch |
|
IBRD |
International Bank for Reconstruction and Development |
|
IFC |
International Finance Corporation |
|
IMF |
International Monetary Fund |
|
IPP |
Independent Power Producer |
|
ISF |
Internal Security Forces |
|
MoD |
Ministry of Defense |
|
MoEW |
Ministry of Energy and Water |
|
MoF |
Ministry of Finance |
|
MoI |
Ministry of Interior |
|
NCC |
National Control Center |
|
OMSAR |
Office of the Minister of State for Administrative Reform |
|
PPP |
Public-Private Partnership |
|
RE |
Renewable Energy |
|
SBA |
Staff-Level Agreement (IMF Stand-By Arrangement) |
|
TA |
Technical Assistance |
|
WB |
World Bank |
[1] All reform data presented
here is based on official Lebanese government sources, such as laws, decrees,
strategies, and verified public data. Where possible, each update is linked to
a document, gazette entry, or institutional publication.

EN
العربية